CPV Ltd strengthened its sustainability strategy with a 491 kWp solar installation delivering 480,000 kWh per year and £63,000 in savings. The project highlights the commercial benefits of large-scale solar, including reduced operating costs, fast payback, and enhanced environmental credentials for an industrial business.
This brochure follows the real-life journey of a customer, Sam, as Spirit Energy designs and installs a 22-panel solar system with a Tesla Powerwall 3. It breaks the process into 11 clear steps, from system design, site surveys, and shade analysis to installation, grid approvals, and final handover. The case study shows exactly what to expect when going solar with Spirit, giving you a transparent view of the expertise and care involved.